[1]
GutiƩrrez, J.A. and Barrientos Monsalve, E. 2020. Management study of the planning levels of the last planner system in construction project. Enfoque Disciplinario. 5, 1 (Jun. 2020), 1-15. DOI:https://doi.org/10.70165/enfdis.v5i1.274.